How to adjust flow interruption pressures:
When adjusting PD-H-L1, first choosing the screw nut
by twisting it in counterclockwise direction, then
after the pressure has been increased to the
specified value, twist the screw nut in
counterclockwise direction to activate the trigger,
when the indicator lights up lightly close and lock
the screw nut, again adjust until the signal is
correct, then close and lock the screw nut.
The PD-H-L2 is adjusted as above. The upper limit
adjustment screw is near to escutcheon, should
adjust the upper limit then the lower limit.
The operational environment should not have
corrosive gas.